HOWEVER, THEY HAVE QUITE A BIT OF WORK ON THE HORIZON. NEW HOSPITAL PROJECT IN LA CROSSE WITH A 2 YEAR DURATION, A 300,000 SQ FT PREFAB SHOP & LOCAL WORK. THESE TWO LARGE PROJECTS WILL BE ACCOMPANIED BY A MULTITUDE OF PROJECTS IN AN EFFORT TO MODERNIZE THE FACILITY THAT WAS ORIGINALLY CONSTRUCTED IN 1941 ON THE 19,000 ACRE SITE. CALL HALL FOR DETAILS. THIS NEW COMPLETELY AUTOMATED LINE IS SCHEDULED TO BE FOLLOWED UP BY A NEW “DIRECT FIRE” LINE (TANK ROUNDS) STARTING IN 2027-2028. THIS HAS BEEN SAID TO BE A 3 YEAR PROJECT THAT CONSISTS OF NEARLY A DOZEN NEW BUILDINGS ON A LINE THAT IS 7200’ LONG. THE IOWA ARMY AMMUNITION PLANT IN MIDDLETOWN, IOWA IS SCHEDULED TO BREAK GROUND THIS FALL ALSO ON A NEARLY $1 BILLION NEW LINE TO MANUFACTURE “INDIRECT FIRE” MUNITIONS (ARTILLERY). THEY ALSO HAVE A 150 MW SOLAR INSTALLATION SCHEDULED TO START IN OCTOBER JUST NORTH OF THE IOWA FERTILIZER PLANT IN WEVER, IOWA THAT IS PLANNING ON PEAKING AT AROUND 70 WIREMEN BY APRIL ’24. CARGILL EDDYVILLE IS CURRENTLY BIDDING OUT THE POWER, CONTROLS, AND INSTRUMENTATION PACKAGE FOR PROJECT SURFER, WHERE LOCAL MAY REALISTICALLY NEED AN ADDITIONAL 60-80 WIREMEN.
#Webber construction office san antonio license
CA STATE LICENSE REQUIRED ON ALL CALLS & A FEW HAVE SOME RESIDENCY REQUIREMENTS. WORK IS VERY SLOW IN THE AREA. REFINERY WORK REQUIRES THE RSO 20 CARD AND SOMETIMES A TWIC. MUST HAVE EMBOSSED ORIGINAL TRAVEL LETTER FROM YOUR HOME LOCAL TO SIGN BOOKS – WILL NOT ACCEPT FAXES. FREQUENTLY ASKED QUESTIONS AND AVAILABLE JOB CALLS CAN BE FOUND AT THE DROPS DOWNS UNDER THE REFERRAL TAB. (10-20)ĭEFINED ($9.03) & CONTRIBUTION/ANNUITY PENSION ($6.34) PLEASE REMEMBER A CURRENT DUES RECEIPT IN ORDER TO SIGN THE BOOK. RESIGN IS THE 10TH-16TH OF EACH MONTH AND CAN BE DONE BY WEBSITE, EMAIL, FAX OR PHONE. BOOKS CAN BE SIGNED IN PERSON NOW DURING NORMAL BUSINESS HOURS & SATURDAYS FROM 7:30 AM TO 11:30 AM. MAJOR FIRE DID SHUT DOWN BP UNTIL AT LEAST THE END OF THE YEAR & LOCAL IS EXPECTED REPAIR WORK SOON.THE LOCAL SOLAR PROJECTS REQUIRE MANPOWER BY OHIO RESIDENTS. REFINERY WORK IS COMPLETE & IS BACK ONLINE. PLEAE READ THE DISPATCH INSTRUCTIONS ON LOCALS HOME PAGE. THE DISPATCH OFFICE IS CLOSED AND HANDLED ONLINE THROUGH THE WEBSITE. NEED A PAID UP DUES RECIEPT & STAMPED CURRENT TRAVEL LETTER. PLEASE REVIEW ALL UPDATES ON OUR WEBSITE AT IBEW6.ORG BEFORE TRAVELING HERE. PROJECTS HAVE BEEN IMPACTED HEAVILY BY COVID-19. IT IS BEING HIGHLY RECOMMEDED BY THE LOCAL THAT ALL MEMBERS GET “FULLY VACCINATED” WITH TWO SHOTS AND A BOOSTER BEFORE PLANNING TO WORK IN SAN FRANCISCO. WORK IS VERY SLOW IN THE AREA WITH FEW CALLS AVAILABLE.

WORK STILL APPEARS TO BE STRONG AROUND THE AREA WITH PLENTY OF OT STILL BEING WORKED. BJC IS STILL IN THE EARLY STAGES, THE NGA IS STILL MOVING FORWARD, AND THE MEAT PROCESSING PLANT HAS STARTED WITH UNDERGROUND WORK GOING ON.

THE WORK IS STILL GOING STRONG BUT IT LOOKS LIKE SOME OF THE CONTRACTORS ARE LEVELING OFF A BIT. THINGS STILL SEEM TO BE HOLDING STEADY IN THE AREA, BUT A HANDFUL OF LAYOFFS HAVE COME IN.